Hinton Public Schools - Multi-Purpose Center Hinton, Oklahoma Owner: Hinton School District
Hinton's new multi-purpose facility is a great example of a miniature sports arena with all the best in seating, lighting, and amenities. The arena dome with locker rooms, folding stage, wrestling room, and hospitality center total almost 17,000 square feet. A high ceiling lobby with public restrooms and concession stand total over 4,000 square feet joining both the new and the existing gymnasium of 19,257 square feet.
Both the new construction and the renovated space totaled 40,309 square feet at a cost of $3 million. The professional arena seating is very spacious and comfortable at 1,400 seats.
Project completed in January of 2007.
_____________________________________________
Avalon School District - Multi-Purpose Center Avalon, Texas Owner: Avalon School District
This Multi-purpose center is 124' feet in diameter and includes 12' foot stemwall to give the building its height of 37 feet. It is a full gymnasium built in Avalon, Texas and is complete with full size basketball court, four locker rooms, a front foyer concession, rest-rooms and seating for approximately 720 spectators.
The cost of this facility is estimated to be $85.00 per square foot or $1.2 million. The dome project began in January of 2002 and was completed in November of 2003 with a completion cost of $50,000 below budget, and a completion date two months earlier than estimated.
____________________________________________
North Central Texas College - Performing Arts Center Gainsville, Texas Owner: North Central Texas College
 The new performing arts center is located on the main campus west of Gainsville, Texas. The main theatre contains seating for 378 in front of a thrust stage 42-feet wide. The stage craft amenities include a fly gallery, revolving stage, orchestra pit, remote technical booth with automated stage controls, and overhead cat-walks for theatre lighting. Also included in this beautiful facility are classrooms, band rehearsal, choir rehearsal, dance studios, a lecture facility, and all stage support services. The high ceiling lobby acts as an art gallery for displays of paintings and sculpture by local artists.
The facility totals 25,608 square feet and was completed in the summer of 2005 at a cost of $5.5 million.
Other Companies and Firms that assisted in this project: Falcon Audio Video - provided Audio, Video, Lighting, and Acoustics
____________________________________________________________________________________
_________________________________________________________________________________
Texhoma Public Schools - Cafeteria & Classrooms Texhoma, Oklahoma Owner: Texhoma Public Schools Superintendant: Rick Kibbe
This double dome faciltiy is located on a traditional campus that is lit on a boundary line between Texas and Oklahoma on the pan handles. The 108-foot diameter, 2-level dome contains nine classrooms and administration area, a full service library, and public restrooms. The adjoining 60-foot diameter dome includes an open cafeteria with seating at tables for 90 students. The two domes are joined together by a connecting structure containing a full service kitchen, food storage, and lobby.
The 18,090 square foot was completed in 2001 at a cost of $1.2 million.
____________________________________________________________________________________
St. Joseph Catholic Church Commerce, Texas Owner: Rev. Charles V. Grahmann, Bishop of the Roman Catholic Diocese Father George Monahgan
This assembly is a 3 story building and is designed with a Sanctuary (6,082 sq.ft.), lobby , restrooms, chapel (892 sq.ft.), and a loggia (1,400 sq.ft.) all totaling approximately 8,374 square feet.
St. Joseph's Catholic Church will begin construction in 2007 with a projected finish date of 2008.
The projected cost is at slightly more than $1 million.
_____________________________________________
Saint Jo - Gymnasium Saint Jo, Texas Owner: Saint Jo Public School District
Gymnasium completed 2006.
|